Deeside Engine Plant
The Engine Plant is located at Deeside, North Wales and employs over 600 members on a site covering 115 acres/0.48 million sq m.
In 2018, a total of 308,415 fully assembled engines (including component sets) were produced for the Burnaston Corolla & Corolla Hybrid vehicles and exported to other Toyota plants building the C-HR, Corolla and Prius Plus.
Engines are produced through a process of Aluminium casting, Machining and Assembly before final inspection and despatch to vehicle plants.
Deeside currently exports engines and machine components to South Africa, Turkey and Japan and were the first overseas plant to produce Toyota's class leading hybrid engines.